Efficient Cool Heat were asked to completely overhaul the existing AHU ‘s whilst in situ. They had been installed 27 years previously.
Bringing it up to date with the latest energy efficient technology and Increasing longevity for up to 25 years.  Replacing the AHU’s was not a option as the plant room had been built around them.

We completely stripped the internal units removing all previous:

  • Dampers
  • Frost Coils
  • Filter Banks
  • Heating Coils
  • DX Coils
  • Motors
  • Scrolls

We then completely sanded and treated the inner housing with specialised oxide anti corrosive paint. A specialist heavy duty paint was then applied as a top coat.

We then installed:

  • Dampers
  • Frost Coils
  • Filter Banks
  • Heating Coils
  • DX Coils
  • Motors
  • Scrolls

Blygold Treated for the coils which prevents corrosion and enhances longevity.

We supplied and installed a high efficiency inverter condensing units serving the new dx coils inside the AHU.